NEW QUESTION 23
The existence of a quality control manual at your key supplier means
- A. That a quality system has been implemented.
- B. That the firm is quality conscious.
- C. That the firm is a certified supplier.
- D. That a quality system has been developed.
Answer: D
NEW QUESTION 24
Given that the population standard deviation is 6.8, what sample size is required to be 90% confident that the estimated mean has an error less than 0.02?
- A. 175,987
- B. 152,083
- C. 312,761
- D. 189,859
Answer: C
NEW QUESTION 25
An electronics firm was experiencing high rejections in their multiple connector manufacturing departments. "p" charts were introduced as part of a program to reduce defectives. Control limits were based on prior history, using the formula:
P' is the historical value of percent defective and n is the number of pieces inspected each week. After six weeks, the following record was accumulated
1,000 pieces were inspected each week in each department. Which department(s) exhibited a point or points out of control during this period (round off calculations to nearest tenth of a percentage point)?
- A. Department 105.
- B. All of the department.
- C. Department 106.
- D. Department 104.
Answer: B
NEW QUESTION 26
Consider the following statement:
"A defect which might affect the appearance or general function of essential parts" This definition describes a seriousness classification described as
- A. Critical.
- B. Minor.
- C. Incidental.
- D. Major.
Answer: D
NEW QUESTION 27
According to Tchebysheff's theorem what % of measurements must lie within 2.5 standard deviations of the mean?
- A. 0.840
- B. 3/4
- C. 0.625
- D. 8/9
Answer: A
NEW QUESTION 28
In obtaining Total Customer Satisfaction, management should NOT undertake which of the following activities?
- A. Encourage sacrificing for the team.
- B. Coordinate efforts of the departments.
- C. Use employee involvement and teamwork.
- D. Encourage team competition.
Answer: D
NEW QUESTION 29
Which of the following control charts are more efficient than an X-bar chart at detecting small shifts in the mean?
I. CUSUM.
II. EWQR.
III. EWMA.
- A. I and III only
- B. II only
- C. III only
- D. I only
Answer: A
NEW QUESTION 30
Which of the following is NOT a statistical level of measurement?
- A. Numerical.
- B. Ratio.
- C. Ordinal.
- D. Nominal.
Answer: A
NEW QUESTION 31
The basic elements of an ultrasonic test systems do NOT include which of the following?
- A. A transducer.
- B. A laser beam.
- C. An electronic system.
- D. A test object.
Answer: B
NEW QUESTION 32
Which of the following statements BEST describes a bimodal distribution?
- A. This distribution shows stratified data and two distinct peaks.
- B. This distribution is truncated.
- C. This distribution shows a single mode and bell shaped distribution.
- D. This distribution has several distribution peaks.
Answer: A
NEW QUESTION 33
Four ingredients are blended to make a final product. Using the data below, what is the expected weight and variation of the final product?
Ingredient A 70 ± 3.00 grams
Ingredient B 20 ± 1.73 grams
Ingredient C 15 ± 1.73 grams
Ingredient D 10 ±- 1.00 grams
- A. 115 ± 7.46 grams
- B. 115 ± 5.73 grams
- C. 115 ± 3.61 grams
- D. 115 ± 4.00 grams
Answer: D
Explanation:
Explanation
NEW QUESTION 34
What does a corrective action do to prevent an existing noncomformity, defect or undesirable situation from recurring?
- A. Minimizes it.
- B. Takes repercussions against those responsible.
- C. Eliminates it.
- D. Takes action against it.
Answer: C
NEW QUESTION 35
If the probability of a success on a single trial is 0.2 and 3 trials are performed, what is the probability of at least one success?
- A. 0.488
- B. 0.600
- C. 0.008
- D. 0.384
Answer: A
NEW QUESTION 36
Select the incorrect statement from among the following. The IDs of a certain piece of tubing are normally distributed with mean 1.00". The proportion of tubing with IDs less than 0.90 is
- A. Less than the proportion with IDs greater than 1.00
- B. Less than the proportion with IDs greater than 1.10
- C. Less than 50 percent.
- D. Less than the proportion of Ids greater than 0.90
Answer: B
NEW QUESTION 37
When trying to find all possible causes of a problem, which of the following tools would be useful?
I. Systematic troubleshooting and brainstorming.
II. Fishbone diagrams and histograms.
III. Checklists and scatter diagrams.
IV. Control charts and graphs.
- A. II, III and IV only
- B. I, II and IV only
- C. I, II, III and IV
- D. I and IV only
Answer: C
NEW QUESTION 38
A normal (Gaussian) distribution curve is
- A. Dome shaped.
- B. Positively skewed.
- C. Bell shaped.
- D. Pear shaped.
Answer: C
NEW QUESTION 39
A company is planning to completely change its employee performance, appraisal and reward system.
Which of the following is NOT viable for consideration in the new system?
- A. Integrating subordinate, peer, customer, and self-evaluations with supervisory ratings.
- B. Requiring work team or group evaluations that are equal in emphasis to individual evaluations.
- C. Requiring less frequent performance reviews, but utilizing many rating categories.
- D. Using continuous improvement, quality and customer satisfaction as key criteria.
Answer: C
NEW QUESTION 40
......
Online Questions - Outstanding Practice To your CQE Exam: https://www.braindumpsvce.com/CQE_exam-dumps-torrent.html
Practice To CQE - BraindumpsVCE Remarkable Practice On your Quality Engineer Exam Exam: https://drive.google.com/open?id=10OU8KpA24w7b5F3g5BUWASi_NkNnciPf