NACE NACE-CIP1-001 Practice Verified Answers - Pass Your Exams For Sure! [2021] Valid Way To Pass CIP Level 1's NACE-CIP1-001 Exam NEW QUESTION 13 Which is a component that supplies most of the features and functions of the material? A. pigment B. solvent C. binder D. additive Answer: C NEW QUESTION 14 On a blast-cleaned surface, Ian ultraviolet light is generally used to detect A. sulfates B. grease [...]

[Q13-Q32] NACE NACE-CIP1-001 Practice Verified Answers - Pass Your Exams For Sure! [2021]

Share

NACE NACE-CIP1-001 Practice Verified Answers - Pass Your Exams For Sure! [2021]

Valid Way To Pass CIP Level 1's  NACE-CIP1-001 Exam

NEW QUESTION 13
Which is a component that supplies most of the features and functions of the material?

  • A. pigment
  • B. solvent
  • C. binder
  • D. additive

Answer: C

 

NEW QUESTION 14
On a blast-cleaned surface, Ian ultraviolet light is generally used to detect

  • A. sulfates
  • B. grease and oil
  • C. soluble chemical salts
  • D. inhibitor residues

Answer: B

 

NEW QUESTION 15
If the project specification DOES NOT state the specific DFT measurement standards, the inspector should use

  • A. a recognized industry standard like SSPC-PA 2 that is broadly accepted
  • B. their best judgment based on similar projects and specifications.
  • C. a detailed checklist and document the lack of a standard.
  • D. NACE 2/SSPC SP10

Answer: A

 

NEW QUESTION 16
The Inspector should record the serial numbers of inspection instruments:

  • A. Only when verifying accuracy of the instrument
  • B. Only if the instrument is suspected of not working properly
  • C. Only if the specification requires it
  • D. Each time the instrument is used

Answer: D

 

NEW QUESTION 17
It is good practice for the NACE Inspector to have instrument calibration certificates available:

  • A. Only if the specification requires it
  • B. In the field only
  • C. At all times
  • D. In the office only

Answer: C

 

NEW QUESTION 18
If inspectors identify issues of non-conformance during an inspection, they should

  • A. wait until the final report is being prepared to identify the issues in writing so they are fully documented
  • B. instruct the contractor's personnel in how to correct the issue so the project is not delayed
  • C. inform both the Contractor and the inspector's supervisor so they can take appropriate corrective actions
  • D. perform additional tests secretly to ensure there are no other potential issues at the site

Answer: C

 

NEW QUESTION 19
If a contractor is using a poorly maintained compressor to supply air for abrasive blast cleaning and conventional airspray, the coating inspector should perform a

  • A. wet film thickness (WFT) measurement.
  • B. dry film thickness (DEI) measurement.
  • C. vial lest.
  • D. blotter test for the presence of oil and water.

Answer: D

 

NEW QUESTION 20
Digital hygrometers

  • A. consist of a bimetallic sensing element protected from wind gusts.
  • B. are used to measure temperature from a distance.
  • C. determine relative humidity, air temperature, and dew point temperature:
  • D. use a thermocouple in contact with the surface to measure temperature

Answer: C

 

NEW QUESTION 21
Safety Data Sheets must be carefully reviewed by:

  • A. The Owner's personnel
  • B. The Application personnel
  • C. All personnel involved in the job
  • D. The Inspection personnel

Answer: C

 

NEW QUESTION 22
Stripe coats are generally applied to:

  • A. Welds
  • B. Complex geometric shapes
  • C. a), b), and c)
  • D. Edges and corners

Answer: C

 

NEW QUESTION 23
When performing tests for oil and grease using an ultra-violet light, the NACE Inspector should be aware that:

  • A. Synthetic oil or grease may not be identified
  • B. Presence of weld spatter may produce a false positive
  • C. Chloride salt may produce a false positive
  • D. Ultra-Violet light may contaminant the surface

Answer: A

 

NEW QUESTION 24
Upon arrival of coating materials, the inspector should

  • A. observe and document the amount of material and batch numbers.
  • B. observe aryl document that the applicator WFT at regular intervals during application.
  • C. observe and document time frame and environmental conditions between each coat.
  • D. review coating contractors' plans for storage of coating materials and confirm they meet national, local and owners' fire and environmental regulations.

Answer: A

 

NEW QUESTION 25
NACE Level 1 Inspectors have been trained to perform:

  • A. Visual inspection and Non-destructive testing
  • B. Visual inspection only
  • C. Visual inspection, Non-Destructive and Destructive testing
  • D. All types of inspection

Answer: A

 

NEW QUESTION 26
The primary difference between Non-Convertible vs. Convertible coatings is:

  • A. Convertible coatings do not undergo a chemical change during curing whereas Non-Convertible coatings do
  • B. Non-Convertible coatings cure by co-reaction whereas Convertible coatings do not
  • C. Convertible coatings cure solely by solvent evaporation whereas Non-Convertible coatings do not
  • D. Non-convertible coatings do not undergo a chemical change during curing whereas Convertible coatings do

Answer: D

 

NEW QUESTION 27
Removal of welds splatter is required:

  • A. When NACE/SSPC abrasive blast standards are specified
  • B. When ISO abrasive blast standards are specified
  • C. When specifically identified in the owner's specification
  • D. On every job

Answer: C

 

NEW QUESTION 28
You are the NACE Inspector on a job where ISO ST 3 has been specified. The Contractor normally works to SSPC standards and been referencing SSPC SP 3.
Could this have any impact on the final surface preparation appearance?

  • A. It depends on which power tool the Contractor selects
  • B. Yes, because the 'two standards are not equivalent
  • C. No, because there is no real difference in the standards
  • D. It depends on which hand tool the Contractor selects

Answer: C

 

NEW QUESTION 29
In the event of a conflict between the project specification and the coating manufactures' product data sheet, the Inspector's first course of action should be too:

  • A. Call the coating manufacturer for clarification
  • B. Call the person who wrote the specification for clarification
  • C. Use the product data sheet as a guide
  • D. Use the job specification as a guide

Answer: D

 

NEW QUESTION 30
When using the ISO comparator in accordance with ISO 8503, if the surface profile does not directly compare to one of the four segments the inspector should:

  • A. Record the segment with the more aggressive profile
  • B. Record the segment with the less aggressive profile
  • C. Use another method as the comparator method is too subjective
  • D. Record your result by identifying two segments

Answer: B

 

NEW QUESTION 31
Using SSPC Vis 1 as a guide when performing a visual inspection of a steel surface prior to surface preparation a NACE Inspector would assign which designations to the surface condition:

  • A. Rust Grades A-D
  • B. Rust Grades 1-4
  • C. Surface Condition H
  • D. Surface Conditions E-G

Answer: A

 

NEW QUESTION 32
......

NACE NACE-CIP1-001 Pre-Exam Practice Tests | BraindumpsVCE: https://www.braindumpsvce.com/NACE-CIP1-001_exam-dumps-torrent.html