Jul-2025 C1000-132 Study Material, Preparation Guide and PDF Download Free C1000-132 Certification Sample Questions with Online Practice Test NEW QUESTION # 63 In the Master PM application, which two meter-based fields can be updated on associated Preventive Maintenance records? (Choose two.) A. Frequency B. Generate WO Ahead By C. Current Meter Reading D. Estimation Type E. Meter Type Answer: A,B [...]

Jul-2025 C1000-132 Study Material, Preparation Guide and PDF Download [Q63-Q85]

Share

Jul-2025 C1000-132 Study Material, Preparation Guide and PDF Download

Free C1000-132 Certification Sample Questions with Online Practice Test

NEW QUESTION # 63
In the Master PM application, which two meter-based fields can be updated on associated Preventive Maintenance records? (Choose two.)

  • A. Frequency
  • B. Generate WO Ahead By
  • C. Current Meter Reading
  • D. Estimation Type
  • E. Meter Type

Answer: A,B

Explanation:
In the IBM Maximo Master PM application, certain meter-based fields can be updated on associated Preventive Maintenance (PM) records when changes are made to the Master PM. Specifically:
* Generate WO Ahead By: This field sets a lead time for generating work orders ahead of their scheduled due date based on meter readings. Updating this field on the Master PM will adjust when work orders are generated on associated PMs
* Frequency: The frequency determines how often maintenance should occur based on meter readings.
When the frequency is updated on the Master PM, this adjustment is applied to associated PMs, ensuring they reflect the updated maintenance interval These updates allow for consistent and centralized management of preventive maintenance intervals and scheduling, essential for meter-based maintenance tracking in Maximo. Other fields like "Current Meter Reading" or "Meter Type" are not directly updated on associated PMs through the Master PM.


NEW QUESTION # 64
What are three statuses used in the Service Requests application? (Choose three.)

  • A. PENDING
  • B. COMPLETED
  • C. QUEUED
  • D. RESOLVED
  • E. APPROVED
  • F. ENTERED

Answer: A,C,D


NEW QUESTION # 65
Where can Default Values be specified for Service Requests created using the Service Request Work Center?

  • A. in the users Profile
  • B. Administration Work Center
  • C. Application Designer
  • D. Service Desk Application

Answer: B


NEW QUESTION # 66
What is the default status in the Quick Reporting Application?

  • A. APPR
  • B. DRAFT
  • C. INPRG
  • D. ENTERED

Answer: C

Explanation:
The default status in the Quick Reporting Application in IBM Maximo Manage is DRAFT.


NEW QUESTION # 67
When setting up a Crew Type, Required Crafts and Required Tools can be specified. What other characteristic can be required for the Crew Type?

  • A. Required Labor
  • B. Required Qualifications
  • C. Required Assets
  • D. Required Skills

Answer: B


NEW QUESTION # 68
If a Service Request has a follow-up Work Order, by default at what two Work Order internal statuses would the Service Requests status be updated? (Choose two.)

  • A. APPR
  • B. comp
  • C. INPRG
  • D. CAN
  • E. CLOSE

Answer: B,C


NEW QUESTION # 69
Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?

  • A. Action Limit -
  • B. Meter Limit
  • C. Warning Limit
  • D. Measurement Limit

Answer: A

Explanation:
In IBM Maximo Manage, the Action Limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type.


NEW QUESTION # 70
In the Work Order Tracking application, when using the Select Value on the Safety Plans field from where can the safety plan be derived?

  • A. Safety Plans that are referenced in the Location Hierarchy.
  • B. Safety Plans where the Location or Asset on the Work Order is referenced as a Work Asset on the Safety Plan.
  • C. It always shows Active Safety Plans that are in the same site as the work order.
  • D. The Safety Plan that is associated with the Preventive Maintenance record.

Answer: B


NEW QUESTION # 71
How does a user make a GL account inactive in the Chart of Accounts application?

  • A. select action Add/Modify GL Account
  • B. select action Change Status
  • C. populate the Expiration Date with a value in the past
  • D. deselect the Active checkbox

Answer: C


NEW QUESTION # 72
In which Maximo add-on can the Build Data Interpreter (BDI) be found?

  • A. Maximo Buildinq Information Modelinq
  • B. Maximo Infrastructure and Buildinq Modeler
  • C. Maximo Health, Safety and Environment
  • D. Maximo Asset Confiquration Manaqer (ACM)

Answer: D


NEW QUESTION # 73
The loT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources?

  • A. Maximo Spatial
  • B. Maximo Assist
  • C. Maximo Safety
  • D. Maximo Monitor
  • E. IBM Watson loT Platform

Answer: D,E

Explanation:
IoT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to C. IBM Watson IoT Platform and E. Maximo Monitor data sources. The IoT Connector in the Administration Work Center can be used to configure a connection to an IoT platform such as IBM Watson IoT Platform and IBM Maximo Asset Monitor1.


NEW QUESTION # 74
In the Work Order Tracking application, a Work Order is generated from a Preventive Maintenance (PM) record. How is the target finish date calculated?

  • A. the PM target finish date
  • B. the Job Plan start date + the Job Plan duration
  • C. the Job Plan finish date
  • D. the Work Order target start date + the Job Plan duration

Answer: D

Explanation:
In the Work Order Tracking application, when a Work Order is generated from a Preventive Maintenance (PM) record, the target finish date is calculated as the Work Order target start date + the Job Plan duration.


NEW QUESTION # 75
In the Receiving application, what are the three statuses that show the overall receipt status of the purchase order?

  • A. COMPLETE
  • B. VOID
  • C. WINSP
  • D. NONE
  • E. PARTIAL
  • F. RETURNED

Answer: A,D,E

Explanation:
In the Receiving application in IBM Maximo Manage, the three statuses that show the overall receipt status of the purchase order are COMPLETE, PARTIAL and NONE.


NEW QUESTION # 76
Where can the Asset Up/Down status be modified?

  • A. from the Report Downtime action on the Work Order
  • B. use the Move/Modify Asset action in the Assets application
  • C. use the Move/Swap/Modify action on the Work Order
  • D. use the Failure Reporting option on the Work Order

Answer: A


NEW QUESTION # 77
Which statement describes Non-Rotating Items?

  • A. It has assets associated with it.
  • B. It can be attached to a parent asset on issue.
  • C. It can be contained within a Kit.
  • D. It can have a meter group associated with it.

Answer: C


NEW QUESTION # 78
Which two events can be triggered from a Condition Monitoring Point? (Choose two.)

  • A. Triggering of a Preventive Maintenance record.
  • B. Creation of an Unscheduled Inspection.
  • C. Creation of a Service Request.
  • D. Creation of a Work Order with a Job Plan applied.
  • E. Triggering a meter rolldown.

Answer: A,D


NEW QUESTION # 79
In the Meters application what are the three meter types?

  • A. FEATURES
  • B. CALIBRATION
  • C. CONTINUOUS
  • D. CONSTANT
  • E. GAUGE
  • F. CHARACTERISTIC

Answer: C,E,F

Explanation:
In the Meters application, the three meter types are GAUGE, CHARACTERISTIC, and CONTINUOUS.
GAUGE meters measure a discrete value or range of values, such as the oil pressure in an engine.
CHARACTERISTIC meters measure a specific attribute of an asset, such as the temperature of an engine.
CONTINUOUS meters track usage or consumption over time, such as the number of hours an asset has been in operation.


NEW QUESTION # 80
How can a user be granted access to a Work Center application?

  • A. using the Security Groups application
  • B. using the Maximo Management Interface
  • C. using the Administration Work Center
  • D. by using self-registration

Answer: A


NEW QUESTION # 81
Select all that apply
What is the appropriate order of phases in order to create a workflow process?

Answer:

Explanation:

1 - Create the process
2 - Validate the process
3 - Enable the process


NEW QUESTION # 82
In the Security Groups application which security group are all users added to using default settings?

  • A. DEFLTREG
  • B. NEWUSER
  • C. DEFUSRREG
  • D. MAXIMOUSERS

Answer: A


NEW QUESTION # 83
Which data storage level provides the sharing of items and company data across multiple organizations?

  • A. SITE
  • B. SET
  • C. SYSTEM
  • D. ORG

Answer: B


NEW QUESTION # 84
What is the default status in the Quick Reporting Application?

  • A. APPR
  • B. INPRG
  • C. DRAFT
  • D. ENTERED

Answer: C

Explanation:
The default status in the Quick Reporting Application in IBM Maximo Manage is DRAFT.


NEW QUESTION # 85
......

C1000-132  Certification Study Guide Pass C1000-132 Fast: https://www.braindumpsvce.com/C1000-132_exam-dumps-torrent.html

C1000-132 Dumps PDF 2025 Program Your Preparation EXAM SUCCESS: https://drive.google.com/open?id=1zq-F7Q7bDFXobE5khezNKGp1XXM6kOOe