NEW QUESTION 59
What are prerequisites for using batch derivation? There are 2 correct answers to this question.
- A. Batch where-used list
- B. Batch determination selection conditions
- C. Process instructions
- D. Receiver-sender relationships
Answer: A,D
NEW QUESTION 60
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
- A. The Individual/Collective indicator of the component
- B. The Planning Strategy of the finished product
- C. The item category of the component in the BOM
- D. The MRP Type of the component
Answer: A
NEW QUESTION 61
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To reduce the totalproduction lead time for along production line
- C. To stage different components for a production line simultaneously
- D. To provide timely updates of inventory management for the staged components
Answer: A,D
NEW QUESTION 62
Where do you maintain the duration of a producton operation?
- A. Bill of material (BOM)
- B. Material master
- C. Work instructions
- D. Routing
Answer: D
NEW QUESTION 63
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question.
- A. They can be created automatically during month end process.
- B. They can be used for repetitive manufacturing.
- C. They can be applied to make-to-stock production order.
- D. They can be used for manufacturing with collective orders.
Answer: B,C
NEW QUESTION 64
What is a typical transportation processing SAP Transportation Management?
- A. Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
- B. Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting
- C. Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting
- D. Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
Answer: D
NEW QUESTION 65
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Setup matrix
- B. Resource network
- C. Work center hierarchy
- D. Operation network
Answer: C
NEW QUESTION 66
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.
- A. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
- B. Manually firm all planned orders for materials within the replenishment lead time of the material
- C. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
- D. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material
Answer: A,B
NEW QUESTION 67
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Cost-related
- B. Milestone-related
- C. Product-related
- D. Order-related
Answer: C,D
NEW QUESTION 68
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
- A. Finite resource and finite strategy
- B. Infinite resource and infinite strategy
- C. Infinite resource and finite strategy
- D. Finite resource and infinite strategy
Answer: A
NEW QUESTION 69
Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? There are 2 correct answers to this question.
- A. Order list
- B. Production list
- C. Resource utilization
- D. Resource overview
Answer: A,C
NEW QUESTION 70
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Setup time
- C. Float after production
- D. Total replenishment lead time
Answer: A,C
NEW QUESTION 71
You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.
- A. Workcenter
- B. Customer
- C. Plant
- D. Supplier
Answer: B,C,D
NEW QUESTION 72
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.
- A. /SAPAPO/PPDS_DELTA_ORD_TRANS
- B. /SAPAPO/CREATE_LOCATION
- C. /SAPAPO/UPD_LOC_SP_PL
- D. /SAPAPO/CURTO_CREATE
Answer: A
NEW QUESTION 73
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.
- A. Material master of the finished product
- B. BOM, in the item for the material
- C. Material master of the finished product
- D. Work center, in the production supply area
Answer: B,D
NEW QUESTION 74
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To reduce the number of material masters
- B. To increase the number of planning levels
- C. To make the assignment of components easier
- D. Tosimplify the structure of bills of material
- E. To reduce the number of changes required in bills of material
Answer: C,D,E
NEW QUESTION 75
Which of the following functions can be performed when the production order has the status "Created" (CRTD)? Please choose the correct answer.
- A. A user can trigger material staging via mass processing (transaction COHV).
- B. A user can schedule a background job to release production orders (transaction COOIS).
- C. A user trigger printing of shop floor paper manually (transaction CO02).
- D. A user trigger material availability check via mass processing (transaction COHV)
Answer: A
NEW QUESTION 76
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.
- A. At order creation
- B. At order settlement
- C. At order release
- D. At order confirmation
Answer: A,C
NEW QUESTION 77
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
- B. The lot size range must be within the lot-size range of the assigned routing.
- C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- D. The assigned routing must NOT have alternative sequences.
- E. The assigned routing must be a rate routing.
Answer: A,B,C
NEW QUESTION 78
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP C/4HANA
- B. SAP Field glass
- C. SAP Ariba
- D. SAP Concur
- E. SAP SuccessFactors
Answer: B,C,D
NEW QUESTION 79
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Reduction of associated capacity requirements
- B. Material staging for next order in sequence
- C. Archiving of documents for assembly scrap
- D. Posting of production costs to the production cost collector
- E. Posting of goods receipt for the product
Answer: A,D,E
NEW QUESTION 80
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You can reschedule the operation using lead the scheduling.
- B. You canreschedule the order using material requirements planning.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You can reschedule the order using lead time scheduling.
Answer: C
NEW QUESTION 81
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Alphanumeric or quota arrangement
- B. Lot size or material cost
- C. Planned order or materialnumber
- D. Validity period or sales order
Answer: A
NEW QUESTION 82
In the first step, you have created master recipes. In which sequence are the additional objects created?
- A. Process order Control recipe Process message PI sheet
- B. Control recipe Process order Process message PI sheet
- C. Process order Control recipe PI sheet Process message
- D. Control recipe Process order PI sheet Process message
Answer: C
NEW QUESTION 83
......
SAP C-TS422-2020 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
Verified C-TS422-2020 dumps Q&As - Pass Guarantee Exam Dumps Test Engine: https://www.braindumpsvce.com/C-TS422-2020_exam-dumps-torrent.html
C-TS422-2020 Dumps for Pass Guaranteed - Pass C-TS422-2020 Exam: https://drive.google.com/open?id=1M33anZPZBMk_oqH-TgDv_uZML9j_OQXc